[1] | Abbasi, O., Noorzai, E., Gharouni Jafari, K., & Golabchi, M. (2020). Exploring the causes of delays in the construction industry using a cause-and-effect diagram: a case study for Iran. Journal of Architectural Engineering, 26(3), 05020008. |
[2] | Abdul-Rahman, H., Berawi, M. A., Berawi, A. R., Mohamed, O., Othman, M., & Yahya, I. A. (2006). Delay mitigation in the Malaysian construction industry. Journal of construction engineering and Management, 132(2), 125-133. |
[3] | Adebayo Adeboye Fashina, Mustafe Abdillahi Omar, Ahmed Abdullahi Sheikh, Funke Folasade Fakunle, (2021). “Exploring the significant factors that influence delays in construction projects in Hargeisa” Heliyon 7 (2021) e06826. www.cell.com/heliyon. |
[4] | Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), 667-677. |
[5] | Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801-808. |
[6] | Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357. |
[7] | Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring Delay Causes of Road Construction Projects in Egypt. Alexandria Engineering Journal, 55, 1515-1539. https://doi.org/10.1016/j.aej.2016.03.006. |
[8] | Banobi, E. T., & Jung, W. (2019). Causes and mitigation strategies of delay in power construction projects: Gaps between owners and contractors in successful and unsuccessful projects. Sustainability, 11(21), 5973. |
[9] | Chalhoub, J., Ayer, S. K., & Ariaratnam, S. T. (2021). Augmented reality for enabling un- and under-trained individuals to complete specialty construction tasks. Journal of Information Technology in Construction, 26. |
[10] | Enshassi, A., Mohamed, S., & Abushaban, S. (2009). Factors affecting the performance of construction projects in the Gaza Strip. Journal of Civil Engineering and Management, 15(3), 269-280. |
[11] | Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), e06826. |
[12] | Gumble, C. (2020). Making the best of a bad situation. Construction Manager, May, p. 18. Retrieved from https://www.constructionmanagermagazine.com/wp-content/uploads/2020/06/Construction_Manager_May_2020.pdf. |
[13] | Arı, K., Coplugil, K. B., Gönültas, I., & Artan, D. (2022, November). A Survey on the Effects of the Covid-19 Pandemic at Construction Sites. In IOP Conference Series: Earth and Environmental Science (Vol. 1101, No. 3, p. 032011). IOP Publishing. |
[14] | Kale, A. R. (2020). Impact of Covid-19 on infrastructure and environment. Purakala, 31(37), 98-105. |
[15] | Islam, M. S., & Trigunarsyah, B. (2017). Construction delays in developing countries: a review. Journal of Construction Engineering and Project Management, 7(1), 1-12. |
[16] | Jones, K. (2020). Construction technology is reshaping the industry. Retrieved on 27 July 2020 from https://www.constructconnect.com/blog/technologyreshaping-construction-industry. |
[17] | Indhu, B. and Yogeswari, K. (2020). Review on Delay Factors Due to Improper Construction Equipment Management. International Journal on Emerging Technologies, 11(1): 209–214. |
[18] | Khatib, B. A., Poh, Y. S., & El-Shafie, A. (2018). Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project. Sustainability, 10(12), 4772. |
[19] | Khodeir, L. M., & Mohamed, A. H. M. (2015). Identifying the latest risk probabilities affecting construction projects in Egypt according to political and economic variables. From January 2011 to January 2013. HBRC journal, 11(1), 129-135. |
[20] | Amoah K. B. O. (2022). Web-Based Building Information Modelling Data Exchange Standardization Protocols for the Architectural, Engineering, and Construction Industry, International Journal of Construction Engineering and Management, Vol. 11 No. 3, 2022, pp. 65-77. doi: 10.5923/j.ijcem.20221103.01. |
[21] | Ling, F. Y. Y., & Hoi, L. (2006). Risks faced by Singapore firms when undertaking construction projects in India. International journal of project management, 24(3), 261-270. |
[22] | Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in developing countries: a case study from Vietnam. International Journal of Project Management, 22(7), 553-561. |
[23] | Madan Kumar Sha, Padam Bahadur Shahi, Ramananda Pandit, Ashok Pandey, (2017). “Causes and Effects of Delays in Construction Projects” IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684, p-ISSN: 2320-334X, Volume 14, Issue 2 Ver. VI (Mar. - Apr. 2017), PP 52-58 www.iosrjournals.org. |
[24] | M M Rahman et al (2 017). IOP Conf. Ser.: Mater. Sci. Eng. 271 012037 DOI 10.1088/1757-899X/271/1/012037. |
[25] | Manal Sayed, Samia Ali and Shady Ahmed, (2017). Need for JIT Implementation: Material Shortage Problems as a Cause of Delay in Construction Projects in Egypt”. International Journal of Civil Engineering and Technology, 8(7), 2017, pp. 30–36. http://iaeme.com/Home/issue/IJCIET?Volume=8&Issue=7. |
[26] | Muhwezi, L., Acai, J., & Otim, G. (2014). An assessment of the factors causing delays in building construction projects in Uganda. International Journal of Construction Engineering and Management, 3(1), 13-23. |
[27] | Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526. |
[28] | Rahman, M. M., Yap, Y. H., Ramli, N. R., Dullah, M. A., & Shamsuddin, M. S. W. (2017, November). Causes of shortage and delay in material supply: a preliminary study. In IOP Conference Series: Materials Science and Engineering (Vol. 271, No. 1, p. 012037). IOP Publishing. |
[29] | Wei, K. S. (2010). Causes, effects, and methods of minimizing delays in construction projects. A project reports. Google Scholar. |
[30] | Wuala, H. D., & Rarasati, A. D. (2020,). Causes of delays in construction projects for developing Southeast Asia countries. In IOP Conference Series: Materials Science and Engineering (Vol. 830, No. 2, p. 022054). IOP Publishing. |
[31] | Serdar, D. & Reza Hosseini M. (2018). Causes of Delays on Construction Projects: A Comprehensive List: International Journal of Managing Projects in Business. DOI: 10.1108/IJMPB-09-2018-0178. |
[32] | Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2020). Causes of delay in the global construction industry: a meta-analytical review. International Journal of Construction Management, 22(8), 1395–1407. https://doi.org/10.1080/15623599.2020.1716132. |
[33] | Indhu, B. & Yogeswari, K. (2020). Review on Delay Factors due to Improper Construction Equipment Management: International Journal on Emerging Technologies 11(1): 209-214 (2020). |
[34] | Cheung, S. O., Yazdani, S., Ghafoori, N., and Singh, A. (2011). Construction Labor Shortage, Challenges, And Solutions: A Survey-Based Approach. Modern Methods and Advances in Structural Engineering and Construction. ISEC-6, Zürich, June 21–26, 2011. |
[35] | Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction management and economics, 28(5), 509-526. |
[36] | Ismail, I., Memon, A. H., & Rahman, I. A. (2013). Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects. International Journal of Construction Technology and Management, 1(2), 2289. |
[37] | Mittal, Y.K., Paul, V.K., Rostami, A. et al. Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries. Asian J Civ Eng21, 649–661 (2020). https://doi.org/10.1007/s42107-020-00227-1. |
[38] | Jung, W., & Han, S. H. (2017). Which risk management is most crucial for controlling project cost? Journal of Management in Engineering, 33(5), 04017029. |