[1] | Al-Gahtani, K. S. (2022). Review Current Value Engineering Studies Towards Improve Automation within Building Information Management (BIM). International Journal of Civil Engineering, Volume 9 (Issue 2), pp.1-9. https://doi.org/10.14445/23488352/IJCE-V9I2P101. |
[2] | Amoah K.B.O. (2022). Web-Based Building Information Modeling Data Exchange Standardization Protocols for the Architectural, Engineering, and Construction Industry. International Journal of Construction Engineering and Management 2022, 11(3): 65-77. |
[3] | Arumsari, P., & Ricco Tanachi R. (2018) IOP Conf. Ser.: Earth Environ. Sci. 195 012015. DOI 10.1088/1755-1315/195/1/012015. |
[4] | Azhar, S. (2011). “Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry.” Leadership. Manage. Eng., 11 (3), 241–252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127. |
[5] | Baarimah, A. O., W. S. Alaloul, M. S. Liew, A. H. M. H. Al-Aidrous, A. M. Alawag, and M. A. Musarat. (2022). “Integration of building information modeling (BIM) and value engineering in construction projects: A bibliometric analysis” 2021. Clim. Change, 2021 Third International Sustainability and Resilience Conference, pp. 362–367. https://doi.org/10.1109/IEEECONF53624.2021.9668045. |
[6] | Demirdöğen, G., N. S. Diren, H. Aladağ, and Z. Işık. (2021). “Lean based maturity framework integrating value, BIM, and big data analytics: Evidence from AEC industry.” Sustainability, 13 (18), 10029. https://doi.org/10.3390/su131810029. |
[7] | Elmousalami, HH., (2019). Intelligent methodology for project conceptual cost prediction. Heliyon. 2019 May 18; 5(5): e01625. doi: 10.1016/j.heliyon. 2019. e01625. PMID: 31193376; PMCID: PMC6526236. |
[8] | Jaewook Lee, Hyuncheul Yang, Jinkang Lim, Taehoon Hong, Jimin Kim & Kwangbok Jeong (2020) BIM-based preliminary estimation method considering the life cycle cost for decision-making in the early design phase, Journal of Asian Architecture and Building Engineering, 19:4, 384-399, https://doi.org/10.1080/13467581.2020.1748635. |
[9] | Kihong Ku DDES & Mojtaba Taiebat M.SC. (2011) BIM Experiences and Expectations: The Constructors' Perspective, International Journal of Construction Education and Research, 7:3, 175-197, DOI: 10.1080/15578771.2010.544155. |
[10] | Lee, J., and Na, S., (2018). Investigation of Practitioners‟ Perceptions for Developing Building Information Modelling (BIM) - Based Value Analysis Model. International Journal of Civil Engineering and Technology, 9(1), 2018, pp. 301-313. http://iaeme.com/Home/issue/IJCIET?Volume=9&Issue=1. |
[11] | Lin, G., Shen, G.Q., Sun, M., Kelly, J., (2011). Identification of key performance indicators for measuring the performance of value management studies in construction. J. Constr. Eng. Manage 137 (9), 698–706. |
[12] | Major, E. (2003). Heads or tails. Paper presented at PMI® Global Congress 2003—EMEA, The Hague, South Holland, The Netherlands. Newtown Square, PA: Project Management Institute. |
[13] | Maurer, J.H., (1996). Key factors in starting and maintaining a VA/VE continuous improvement program. Save Proceedings, pp. 147–152. |
[14] | Nader Naderpajouh & Abbas Afshar (2008) A case‐based reasoning approach to application of value engineering methodology in the construction industry, Construction Management and Economics, 26:4, 363-372, DOI: 10.1080/01446190801905398. |
[15] | Nikmehr, B.; Hosseini, M.R.; Wang, J.; Chileshe, N.; Rameezdeen, R. BIM-Based Tools for Managing Construction and Demolition Waste (CDW): A Scoping Review. Sustainability 2021, 13, 8427. https://doi.org/10.3390/su13158427. |
[16] | Nawaz, A.A., Su, X., & Nasir, I.M. (2021). BIM Adoption and Its Impact on Planning and Scheduling Influencing Mega Plan Projects- (CPEC-) Quantitative Approach. Complex., 2021, 8818296: 1-8818296: 9. |
[17] | Pour Rahimian, F., Seyedzadeh, S., Oliver, S., Rodriguez, S., & Dawood, N. (2020). On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning. Automation in Construction, 110. https://doi.org/10.1016/j.autcon.2019.103012. |
[18] | Ranjbaran, Ye., et al. (2014). “4D-base value engineering.” Construction Research Congress 2014, ASCE 2014, 1606–1615. https://doi.org/10.1061/9780784413517.164. |
[19] | Ridder, H.G. (2012). Review of Case Study Research. Design and Methods 4th ed., by R. K. Yin]. Zeitschrift Für Personalforschung / German Journal of Research in Human Resource Management, 26(1), 93–95. http://www.jstor.org/stable/23279888. |
[20] | Taher, A., Rashid, I & Emad, E. (2019). Integration of Building Information Modeling with Value Engineering in Construction Industry-Case Study. International Journal of Basic and Applied Sciences, 8(4), 75-82. |
[21] | Wen, Y. 2014. “Research on cost control of construction project based on the theory of lean construction and BIM: Case study.” The Open Construction and Building Technology Journal. 8. 382-388. https://doi.org/10.2174/1874836801408010382. |
[22] | Zhang, L, & El-Gohary, N. (2022) Human-centred and BIM-integrated automated value analysis of buildings, International Journal of Construction Management, DOI: 10.1080/15623599.2022.2025555. |