[1] | Alaghbari, M, Razali, A, Salim, A. & Ernawati, E (2007); The Significant Factors Causing in Delay of Building Construction Projects Malaysia, In The Journal of Engineering, Construction and Architectural Management, Vol. 05(05); 12 - 15. |
[2] | Al-Keim, A., (2017); “Strategies to Reduce Cost Overruns and Schedule Delays in Construction Projects”, Published Ph.D Dissertation, Doctor of Business Administration, College of Management and Technology, Walden University, Walden Dissertations and Doctoral Studies Collection, 145 Pages. |
[3] | Albogamy, A., Scott, D., & Dawood, N., (2013); “Dilemma of Saudi Arabian Construction Industry”, in the KICEM Journal of Construction Engineering and Project Management, Vol.03(04), 35 - 40. |
[4] | Alinaitwe, H. & Ayesiga, R. (2013); Success Factors for the Implementation of Public Private Partnerships in the Construction Industry in Uganda. In the Journal of Construction in Developing Countries. Vol.18(02), 01 - 14. |
[5] | Alzara, M., Kashiwagi, J., Kashiwagi, D., Al-Tassan, A., (2016); “Using PIPS to Minimize Causes of Delay in Saudi Arabian Construction Projects: University Case Study”, in the Procedia Engineering, the International Conference on Sustainable Design, Engineering and Construction, Published by ELSEVIER, Science Direct, Peer-review under responsibility of the organizing committee of ICSDEC 2016, Page 932-939, (doi:10.1016/j.proeng.2016.04.121). |
[6] | Amandin, M.M, & Kule, J.M, (2016); Project Delays on Cost Overrun Risks: A Study of Gasabo District Construction Projects in Kigali, Rwanda; In the Journal of Advanced Research, Vol.(05)(01). |
[7] | Ameh, O, Soyingbe, A & Odusami, K.T, (2010); Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria, In the Journal of Construction in Developing Countries, Vol. (15)(02), 49 - 67. |
[8] | Assaf, S.A. & Al- Hejji, S. (2006); Causes of Delays in Large Construction Projects, In the International Journal of Project Management, Vol.(24)(04), 349 - 357. |
[9] | Awolesi, J.A.B., Fabi, J.K., & Akinseinde, O.A., (2015); “Assessment of Contractors’ Mitigating Measures for Cost Overrun of Building Projects in South-Western Nigeria”, in the Journal of Sustainable Development, Vol.(08)(09), ISSN 1913-9063; E-ISSN1913-9071, Published by Canadian Center of Science & Education (DOI:10.5539/jsd.v8n9p139) (URL: http://dx.doi.org/10.5539/jsd.v8n9p139). |
[10] | Azhar, N, Rizwan, U, Farouqui, F. & Ahmed, S. (2008); Cost Overrun Factors in Construction Industry of Pakistan; Advancing and Integrating Construction Education Research & Practice, 499 - 508. |
[11] | Aziz, R. (2013); Factors Causing Cost Variation for Constructing Wastewater Projects in Egypt, In The Alexandria Engineering Journal, Vol.(52)(01), 51 - 66. |
[12] | Bentil, E, Addy, E.N, Asare, E.K & Fokou-kusi, A. (2017); The Level of Existence and Impact of Cost and Time overrun in Building Construction Project in Ghana, In The Journal of Civil and Environmental, Vol.(22)(01), 21 - 36. |
[13] | Bitomwa, H (2013); Evaluation of the Causes of Project Cost Overrun Within the Tanzania Construction Sector, Unpublished Undergraduate Dissertation, Department of Building Economics, ARDHI University(ARU), Dar-Es-Salaam, United Republic of Tanzania. |
[14] | Braimah, N. (2008); Understanding Construction Delay Analysis and the Role of Preconstruction Programming, In the Journal of Management in Engineering, Vol.(04)(06), 25 - 44. |
[15] | Bramble, B. & Callahan, M. (1987); Construction Delay Claims, Published by John Wiley & Sons, Inc., USA. |
[16] | Chan, D, Chan, A, Lam, T. & Chan, H. (2010); Exploring the Key Risks and Risk Mitigation Measures for Guaranteed Maximum Price and Target Cost Contracts in Construction, In the Journal of Construction Law Journal, Vol.(26)(05), 364 - 378. |
[17] | Chitkara, K.K. (2011); Construction Project Management, Planning, Scheduling and Controlling, 2nd Edition, Published by McGraw Hills. |
[18] | Chidambaram, R., & Potty, N.S., (2014); “Qualitative Analysis of Time Delay and Cost Overrun in Multiple Design and Build Projects”, A Paper Presented During the International Conference Data Mining, Civil and Mechanical Engineering (ICDMCME) February 04-05, 2014, Bali, Indonesia, (http://dx.doi.org/10.15242/IIE.E0214003). |
[19] | Cunningham, T., (2017); “What Causes Cost Overruns on Building Projects? - An Overview”, School of Surveying and Construction Management, Dublin Institute of Technology, 28 Pages, (https://arrow.dit.ie/cgi/viewcontent.cgi?article=10 70&context=beschreoth). |
[20] | Danso, H. & Antwi, J. (2012); Evaluation of the Factors Influencing Time and Cost Overruns in Telecom Tower Construction in Ghana, In the Journal of Civil and Environmental Research, Vol.(02)(06), 15 - 24. |
[21] | Doloi, H. (2011); Understanding Stakeholders' Perspective of Cost Estimation in Project Management, In The International Journal of Project Management, Vol.(29)(05), 622 - 636. |
[22] | Dolage, D.A.R., & Pathmarajah, T (2015); “Mitigation of Delays Attributable to the Contractors in the Construction Industry of Sri Lanka - Consultants’ Perspective”, in the Journal of Engineer, Vol.(08)(01), 21 - 30, Published by the Institution of Engineers. |
[23] | Doran, T, Mansfield, N.R & Ugwu, O.O, (1994); Causes of Delays and Cost Overrun 4in Nigerian Construction Projects, In the International Journal of Project Management, Vol.(12)(04), 254 - 260. |
[24] | Enshassi, A, Al-Najjar, J, & Kumaraswamy, M. (2009a); Delays and Cost Overruns in the Construction Projects in the Gaza Strip, In the Journal of Financial Management of Property and Construction, Vol.(14)(02), 126 - 151. |
[25] | Flyvbjerg, B. (2005); Policy and Planning of Large Infrastructure Project Problems, Causes, Cures, World Bank Policy Research Working Paper 3781. |
[26] | Frimpong, Y, Oluwoye, J. & Crawford, L. (2003); Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries; Ghana as a Case Study, In the International Journal of Project Management, Vol.(21)(05), 321 - 326. |
[27] | Gahtan, H. & Mohan, S. (2007); Investigation of Significant Factors Influencing Time and Cost Overrun in Building Projects, In the Civil and Environmental Research, Vol.(12)(16), 25 - 44. |
[28] | Gunduz, M., Nielsen, Y. & Özdemir, M. (2013); Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey, In the Journal of Management in Engineering, Vol.(29)(02), 133 - 139. |
[29] | Heravi, G., & Mohammadian, M., (2017); “Cost Overruns and Delay in Municipal Construction Project in Developing Countries”, In the AUT Journal of Civil Engineering, Vol.(01)(01), 31 - 38 (DOI: 10.22060/ceej.2017.12189.5163). |
[30] | Hwang, B.O., & Yang, S., (2014); “Rework and Schedule Performance; A Profile of Incidence, Impact, Causes and Solutions”, in the Journal of Engineering, Construction and Architectural Management, Vol.(21)(02), 190 - 205, Published by Emerald Group Publishing Limited, (DOI:10.1108/ECAM-10-2012-0101). |
[31] | Ijigah, E.A, Ogunbode, E.E. & Ibrahim, M.O. (2012); Analysis and Prediction of Cost and Time Overrun of Millennium Development Goals (MDGS) Construction Project in Nigeria, In the International Journal and Books Hosting, Vol.(02)(10). |
[32] | Iyer, K, Chaphalkar, N. & Joshi, G.A. (2007); Understanding Time Delay Disputes in Construction Contracts, In the International Journal of Project Management, Vol.(26)(02), 174 - 184. |
[33] | Jeykanthan J, & Jayawardena A.K.W, (2012); Mitigating Delays in Donor Funded Projects in Sri Lanka, In the KSCE Journal of Civil Engineering, Vol.(22)(16), 221 - 234. |
[34] | Kaliba, C, Muya, M, & Mumba, K. (2009); Cost Escalation and Schedule Delays in Road Construction Projects in Zambia, In the International Journal of Project Management, Vol. (02)(05), 522 - 531. |
[35] | Kamaruzzaman, S. & Ali, A. (2010), Cost Performance for Building Construction Projects in Klang Valley, In the Journal of Building Performance, Vol.(01)(01), 110 - 118. |
[36] | Kesavan, M., Gobidan, N.N., & Dissanayake, P.B.G., (2015); “Planning & Mitigation Methods to Reduce the Project Delays in Sri Lankan Civil Engineering Construction Industries”, A Paper Presented During the 6th International Conference on Structural Engineering and Construction Management, (ICSECM), Kandy, Sri Lanka, 11th – 13th December, 2015, Page 102 to 107. |
[37] | Kihaule, A. (2011); Analysis of Determinants of Rural Households Purchase of Micro Health Insurance Plans in Tanzania. Nairobi, Research Proposal Approved and Funded by the African Economic Research Consortium (AERC). |
[38] | Kikwasi, G. (2012); Causes and Effect of Delays and Disruption in Construction Project in Tanzania, In The Australasian Journal of Construction Economics and Building. Conference Series I, Issue (02), 52 - 59. |
[39] | Kothari, C.R, (2004); Research Methodology: Methods and Techniques, 2nd Revised Edition, New Age International (P) Limited Publishers, New Delhi, India. |
[40] | Koushki, P, Al‐Rashid, K. & Kartam, N. (2007); Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait, In the Journal of Construction Management and Economics, Vol.(23)(03), 285 - 294. |
[41] | Kumaraswamy, M. M. & Chan, D.W.N. (1998); Contributors to Construction Delays in Indonesia, In the Journal of Construction Management and Economics, Vol.(16), 17 - 29. |
[42] | Kyando, R. (2013); “Magnitude of Time and Cost Overruns in Building Projects”, Unpublished Undergraduate Dissertation, Department of Building Economics, Ardhi University(ARU), Dar-Es-Salaam, Tanzania. |
[43] | Leeman, T. (2007); Project Management: Managing the Chaos of Change, In the Journal of Business Strategy, Vol.(23)(05), Page 5. |
[44] | Le-Hoai, L, Lee, Y.D. and Lee, J.Y. (2008); Delay and Cost Overrun in Vietnam Large Construction Projects: A Comparison with Other Selected Countries, In the KSCE Journal of Civil Engineering, Vol.(12)(06), 367 - 377. |
[45] | Lester, A. (2000); Project Planning and Control. Published by Butterworth Heinemann, Oxford, United Kingdom (U.K). |
[46] | Luvara G.M.V., Phoya, S., Tesha, D.N.G.A.K., & Lyimo K.S., (2018); “Critical Factors Causing Delay and Cost Overrun in Public Building Projects in Dar-Es-Salaam, Tanzania”, in the PARIPEX - Indian Journal of Research, Vol.(07)(07), 11 - 16, ISSN-2250-1991, (https://www.worldwidejournals.com/paripex/file.php?val=July_2018_1530787910__84.pdf). |
[47] | Luvara G.M.V. & Mwemezi B.R., (2017); “Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania”, in the International Journal of Construction Engineering and Management, Vol.(06)(01), 13 - 21, Published by Scientific & Academic Publishing, p-ISSN:2326-1080; e-ISSN:2326-1102, (DOI:10.5923/j.ijcem. 20170601.02). |
[48] | Mahamid, I. & Dmaidi, N. (2013); Risks Leading to Cost Overrun in Building Construction from Consultants’ Perspective, Organization, Technology and Management in Construction, Vol.(05)(02), 860 - 873. |
[49] | Marzouk, M.M. & El-Rasas, T.I. (2014); Analyzing Delay Causes in Egyptian Construction Projects, In the Journal of Advanced Research, Vol.(05)(01), 49 - 55. |
[50] | McCord, J., McCord, M., Davis, P.T., Haran, M., & Rodgers, W.J., (2015); “Understanding Delays in Housing Construction: Evidence from Northern Ireland”, In the Journal of Financial Management of Property and Construction, Vol.(20)(03), 286 - 319 Published by Emerald Group Publishing Limited, (DOI:10.1108/JFMPC-07-2015 -0028). |
[51] | Mchome, E.E, (2014); Development of a Model for Improvement of Transport Network in Informal Settlements in Dar-Es-Salaam, Tanzania, PhD Thesis, University of Dar-Es-Salaam (UDSM), Dar-Es-Salaam, Tanzania. |
[52] | Memon, A.H, Rahman, I.A. & Azis, A.A.A. (2013a); Assessing Causal Relationships Between Construction Resources and Cost Overrun Using PLS Path Modeling Focusing in Southern and Central Region of Malaysia Material Resource, In the Journal of Engineering and Technology, Vol.(04)(01), 67 - 77. |
[53] | Memon, A.H., Rahman, I.A. & Azis, A.A.A. (2011); “Preliminary Study on Causative Factors Leading to Construction Cost Overrun”, in the International Journal of Sustainable Construction Engineering & Technology, Vol.(02)(01). |
[54] | Mtallib, M.O.A. (2007); Evaluation of the Relationship Between Delayed Payments and Cost and Time Overruns, Unpublished Masters Dissertation, Department of Building Faculty of Environmental Design, Nigeria, Ahmadu Bello University. |
[55] | Mukuka, M.J. (2015); Cost and Schedule Overrun in Construction Project in South Africa, Unpublished Master Thesis, M.Tech. (Construction Management), University of Johannesburg, Johannesburg, South Africa, 147 Pages (https://0x9.me/k7meB). |
[56] | Naveenkumar, G.V. & Prabhu, V. (2016); Factors Influencing Time and Cost Overruns in Construction Projects, In the International Journal of Innovative Research in Science, Engineering and Technology. |
[57] | Nawaz, T, Shareef, N.A. & Ikram, A.A. (2013); Cost Performance in Construction Industry of Pakistan, In the Journal of Industrial Engineering Letters Vol.(03)(02), 19-33. |
[58] | Nicholas, J. (2001); Project Management for Business and Technology. Published By Prentice Hall, New Jersey, USA. |
[59] | Olawale, Y. & Sun, M. (2010); Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice, In the Journal of Construction Management and Economics, Vol.(28)(05), 509 - 526. |
[60] | Pai, S.K. & Bharath, J.R. (2013); Analysis of Critical Causes of Delays in Indian Infrastructure Projects, In the International Journal of Innovative Research and Development, Vol.(02)(03), 251 - 263. |
[61] | Pallangyo, M. (2013); Assessment of the Causes and Effect of Cost Overrun in Building Construction, Unpublished Undergraduate Dissertation, Department of Building Economics, Dar-Es- Salaam, ARDHI University(ARU), Dar-Es-Salaam, Tanzania. |
[62] | Polat, G., Okay, F., & Eray, E., (2014); “Factors Affecting Cost Overruns in Micro-scaled Construction Companies”, in the Procedia Engineering, Vol.(85), 428 - 435, Published by Science Direct, ELSEVIER, (DOI:10.1016/j.proeng.2014.10 .569). |
[63] | Rahman, A, Berawi, H, Berawi, M.A, Mohammed, A.R, Othman, M. & Yahya, I. A. (2006); Delay Mitigation in the Malaysian Construction Industry, In the Journal of Construction Engineering and Management, Vol.(132)(02), 125 - 133. |
[64] | Rahman, I.A, Memon, A.H. & Karim, A.T. (2013); Significant Factors Causing Delays and Cost Overrun in Large Construction Projects in Malaysia, In the Journal of Applied Science, Vol.(13)(02), 286 - 293. |
[65] | Rajakumar, A.C. (2016); Analysis of Cost Overrun in Road Construction Activities – A Critical Review, In the International Research Journal of Engineering and Technology, Vol.(03), e-ISSN 2395-0056. |
[66] | Ramabhadran, M., (2018); “An Investigation into Cost Overrun in Construction Projects in United Arab Emirates”, in the International Journal of Construction Engineering and Management, Vol.(07)(01), 01 - 21, Published by Scientific & Academic Pulishing, (DOI: 10.5923/j.ijcem.20180701.01). |
[67] | Sambasivan, T. & Soon, W, (2006); Causes and Effect of Delays in Malaysian Construction Industry, In the Journal of Industrial Engineering Letters, Vol.(03)(02), 33 - 42. |
[68] | Shibani, A., & Arumugam, K., (2015); “Avoiding Cost Overruns in Construction Projects in India”, in the Journal of Management Studies, Vol.(03),(07-08), 192 - 202, David Publishing, (DOI: 10.17265/2328-2185/2015.0708.003). |
[69] | Srdic, A., & Selih, J., (2015); “Delays in Construction Projects: Causes and Mitigation,” In an International Journal of Organization, Technology and Management in Construction, Vol.(07)(03), 1383 - 1389. |
[70] | Subramani, T, Sruthi, P.S. & Mkavitha, J. (2014); Causes of Cost Overrun in Construction, In the Journal of Engineering, Vol.(02)(02), 23 - 32. |
[71] | Soliman, E., (2017); “Recommendations to Mitigate Delay Causes in Kuwait Construction Projects”, in the American Journal of Civil Engineering and Architecture, Vol.(05)(06), 253 - 262, Published by Science & Education Publishing (SciEP), (DOI:10.12691/ajcea-5-6-5). |
[72] | Trueman, C. (2015); Structured Questionnaire, History of Learning Site, (https://0x9.me/P7QNF). |