[1] | A. A. Azis, A. H. Memon, I. A. Rahman, Q. A. Latif, and S. Nagapan, “Cost management of large construction projects in south Malaysia,” in IEEE Symposium on Business, Engineering and Industrial Applications, 2012. |
[2] | R. Pilcher, Project Cost Control in Construction, 2nd ed., UK: Oxford Blackwell Science, 1992. |
[3] | H. Li, “Study on Construction Cost of Construction Projects,” Asian Social Science, vol. 5, no. 8, pp. 144-149, 2009. |
[4] | M. F. Khamidi, W. A. Khan, and A. Idrus, “The cost monitoring of construction projects through earned value analysis,” in International Conference on Economics and Finance Research IPDER, Singapore, 2011. |
[5] | B. Chigara, T. Moyo, and F. H. Mudzengerere, “An analysis of cost management strategies employed by building contractors on projects in Zimbabwe,” International Journal of Sustainable Construction Engineering & Technology, vol. 4, no. 2, pp. 1-13, 2013. |
[6] | A. H. Memon, I. A. Rahman, M. R. Abdullah, and A. A. Azis, “Factors affecting construction cost in mara large construction project: Perspective of project management consultant,” International Journal of Sustainable Construction Engineering & Technology, vol. 1, no. 2, 2010. |
[7] | G. Yang, G. Huang, and H. Gao, “Research on the strategy of construction material procurement when the price fluctuation is considered”, in International Conference on Management and Service Science, 2010. |
[8] | J. E. Weidman, K. R. Miller, J. P. Christofferson, and J. S. Newitt, “Best Practices for dealing with price volatility in commercial construction,” International Journal of Construction Education and Research, vol. 7, pp. 276-293, 2011. |
[9] | B. Bloch, “Volatility in the residential housing market: An international perspective,” Property Management, vol. 15, no. 1, pp. 12-24, 1997. |
[10] | Department of Employment, Housing and Construction Statistics, The Stationery Office, London, 2002. |
[11] | S. Yisa, I. Ndekugri, and B. Ambrose, “A review of changes in the UK construction industry: Their implications for the marketing of construction services,” European Journal of Marketing, vol. 30, no. 3, pp. 47-65, 1996. |
[12] | E. C. Hui, K-H. Yu, and I-M. Ng, “The dynamics of housing demand under a linked-exchange rate system,” Habitat International, vol. 44, pp. 50-61, 2014. |
[13] | M. Ball, Markets and institutions in real estate and consturction, UK: Blackwell, 2008. |
[14] | R. Galvin, “Thermal upgrades of existing homes in Germany: The building code, subsidies, and economic efficiency,” Energy and Buildings, vol. 42, pp. 834-844, 2010. |
[15] | J. Subedi, R. M. Ghimire, R. P. Neupane, and S. Amatya, “Cost difference of buildings in Kathmandu constructed with and without earthquake safer features,” International Journal of Disaster Resilience in the Built Environmental and Resource Economics, vol. 7, no. 5, pp. 444-459, 2016. |
[16] | G. F. Sinden, J. R. Mason, D. G. Poverbs, and C. A. Booth, “The new Construction Act: Views and perceptions of construction industry stakeholders,” Structural Survey, vol. 30, no. 4, pp. 333-343, 2012. |
[17] | L. O. Oyewobi, A. O. Windapo, and J. O. B. Rotimi, “Environment, competitive strategy, and organizational characteristics: A path analytic model of construction organizations’ performance in South Africa,” Canadian Journal of Administrative Sciences, vol. 33, pp. 213-226, 2016. |
[18] | G. O. Assibey-Mensah, “Ghana’s construction industry and global competition,” Journal of Black Studies, vol. 39, no. 6, pp. 974-989, 2009. |
[19] | H. Doloi, “Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects,” Journal of Construction Engineering and Management, vol. 139, no. 3, pp. 267-279, 2013. |
[20] | H. Xiao, and D. Proverbs, “Factors influencing contractor performance: An international investigation,” Engineering, Construction and Architectural Management Journal, vol. 10, no. 5, pp. 322-332, 2003. |
[21] | H. Xiao, and Y. Ling, “Key relationshipbased determinants of project performance in China,” Journal of Buiding and Environment, vol. 41, pp. 915-925, 2006. |
[22] | S. Olander, and Landin, “Evaluation of stakeholder influence in the implementation of construction projects,” 2005. |
[23] | N. Ahmad, "Important client attributes that influence project success: A focus on the briefing process" in IEEE Symposium on Business, Engineering and Industrial Applications, 2011. |
[24] | M. O. Dada, “The influence of project team relationships on cost growth,” Journal of Financial Management of Property and Construction, vol. 19, no. 1, pp. 76-94, 2014. |
[25] | A. Dahiru, “Appraising factors influencing construction engineering cost estimates,” Journal of Engineering, Technology and Environmen, vol. 11, pp. 89-102, 2015. |
[26] | N. A. Bair, R. Yusuff, N. Ismail, A. Jaapar, and R. Ahmad, “Factors influencing the construction cost of industrialised building system (IBS) Projects,” Procedia-Social and Behavioral Sciences vol. 35, pp. 689-696, 2012. |
[27] | T-C. Toh, C. Ting, K-N. Ali, G-U. Aliagha, and O. Munir, “Critical cost factors of building construction projects in Malaysia,” in International Conference on Asia Pacific Business Innovation and Technology Management, 2012. |
[28] | F. M. Mckenzie, and S. Rowley, “Housing market failure in a booming economy,” Housing Studies, vol. 28, no. 3, pp. 373-388, 2013. |
[29] | Y. Q. Chen, Y. B. Zhang, J. Y. Liu, and P, Mo, “Interrelationships among critical success factors of construction projects based on the structural equation model,” Journal of Management in Engineering, vol. 28, no. 3, pp. 243-251, 2012. |
[30] | B-G. Hwang, and J. S. Tan, “Green building project management: Obstacles and solutions for sustainable development,” Sustainable Development, vol. 20, no. 5, pp. 335-349, 2010. |
[31] | T-H. Lai, W-C. Wang, and H-H. Wang, “AHP- and simulation-based budget determination procedure for public building construction projects,” Automation in Construction, vol. 17, no. 5, pp. 623-632, 2008. |
[32] | B. A. Muhammad, I. Abdulateef, and B. D. Ladi, “Assessment of cost impact in health and safety on construction projects,” American Journal of Engineering Research, vol. 4, no. 3, pp. 25-30, 2015. |
[33] | J. Rodriguez, "Construction contracting: All about cost-plus contract," The Balance, 2017. |
[34] | M. M. Musa, R. B. Amirudin, T. Sofield, and M. A. Musa, “Influence of external environmental factors on the success of public housing projects in developing countries,” Construction Economics and Building, vol. 15, no. 4, pp. 30-44, 2015. |
[35] | C. Pugh, “The theory and practice of housing sector development for developing countries,” Housing Studies, vol. 16, no. 4, pp. 399-423, 2001. |
[36] | F. Ozkan, O. Ozkan, and M. Gunduz, “Causal relationship between construction investment policy and economic growth in Turkey,” Technological Forecasting & Social Change, vol. 79, pp. 362-370, 2012. |
[37] | A. Panibratov, “Internationalization process of Russian construction industry: Inward investments perspective,” Journal for East European Management Studies, vol. 14, no. 2, pp. 210-228, 2009. |
[38] | J. Raftery, B. Pasadilla, Y. H. Chiang, C. M. Hui, and B. S. Tan, “Globalization and construction industry development: Implications of recent developments in the construction sector in Asia,” Construction Management and Economics, vol. 16, pp. 729-737, 1998. |
[39] | Y. Chang, S. Wilkinson, R. Potangaroa, and E. Seville, “Resource challenges for housing reconstruction: A longitudinal study of the Australian bushfires,” Disaster Prevention and Management: An International Journal, vol. 22, no. 2, pp. 172-181, 2013. |
[40] | MBIE, Housing pressures in Christchurch, Ministry of Business, Innovation and Employment, Wellington, New Zealand, 2013. |
[41] | T. Havard, financial feasibility studies for property development theory and practice, UK: Taylor & Francis Group, 2014. |
[42] | R. McCarthy, “Understanding project costs and building costs,” Managing Library Finances, vol. 17, no. 1, pp. 6-9, 2004. |
[43] | ICMS, "Global consistency in presenting construction costs," International Construction Measurement Standards, 2017. |
[44] | J. F. Hair, W. C. Black, B. J. Babin, and R. E. Anderson, Multivariate data analysis, Upper Saddle River, New Jersey: Pearson Education International, 2010. |
[45] | S. J. Coakes, SPSS: Analysis without Anguish: Version 12.0 for Windows, Sydney: Wiley, 2005. |
[46] | M. D. Islam, and O. O. Faniran, “Structural equation model of project planning effectiveness,” Construction Management and Economics, vol. 23, no. 2, pp. 215-223, 2005. |
[47] | H. Li, D. Arditi, and Z. Wang, “Transaction-related issues and construction project performance,” Construction Management & Economics, vol. 30, no. 2, pp. 151-164, 2012. |
[48] | J. J. Vaske, J. Beaman, and C. C. Sponarski, “Rethinking internal consistency in Cronbach's alpha,” Leisure Sciences, vol. 39, no. 2, pp. 163-173, 2017. |
[49] | De Vet et al., “Spearman–Brown prophecy formula and Cronbach's alpha: Different faces of reliability and opportunities for new applications,” Journal of Clinical Epidemiology, vol. 85, pp. 45-49, 2017. |
[50] | H-F. Lin, “Predicting consumer intentions to shop online: An empirical test of competing theories,” Electronic Commerce Research and Applications, vol. 6, no. 4, pp. 433-442, 2007. |
[51] | R. P. Bagozzi, and Y. Yi, “On the evaluation of structural equation models,” Journal of the Academy of Marketing Science, vol. 16, no. 1, pp. 74-94, 1988. |
[52] | F. T. Phua, and S. Rowlinson, “How important is cooperation to construction project success? A grounded empirical quantification,” Engineering, Construction and Architectural Management, vol. 11, pp. 45-54, 2004. |
[53] | C. N. Dang, and L. Le-Hoai, “Critical success factors for implementation process of design-build projects in Vietnam,” Journal of Engineering, Design and Technology, vol. 14, no. 1, pp. 17-32, 2016. |
[54] | A. Heravi, V. Coffey, and B. Trigunarsyah, “Evaluating the level of stakeholder involvement during the project planning processes of building projects,” International Journal of Project Management, vol. 33, no. 5, pp. 985-997, 2015. |
[55] | G. D. Oppong, A. P. Chan, and A. Dansoh, “A review of stakeholder management performance attributes in construction projects,” International Journal of Project Management, vol. 35, no. 6, pp. 1037-1051, 2017. |
[56] | C. Weddikkara, and K. Devapriya, “Demand and Supply Trends and Construction Industry Development: A Case Study in the Sri Lankan Construction Industry,” Australasian Journal of Construction Economics and Building, vol. 1, no. 1, pp. 91-105, 2001. |
[57] | D. Myers, Construction economics : A new approach, 3rd ed., New York: Routledge, 2013. |
[58] | G. Yang, and H. Gao, “Study on optimization of the plan of large scale construction projects,” 2007. |
[59] | G. Ang, M. Groosman, and N. Scholten, “Dutch performance-based approach to building regulations and public procurement,” Building Research & Information, vol. 33, no. 2, pp. 107-119, 2005. |
[60] | J. P. Rayes, J. T. San-Jose, J. Cuadrado, and R. Sancibrian, “Health & Safety criteria for determining the sustainable value of construction projects,” Safety Science, vol. 62, pp. 221-232, 2014. |
[61] | E. Osipova, “The impact of contractual and collaboration forms on risk management in Swedish construction projects,” in Conference on World of Construction Project Management, TU Delft, Netherlands, 2007. |
[62] | B. Bahadir, and O. Mykhaylova, “Housing market dynamics with delays in the construction sector,” Journal of Housing Economics, vol. 26, pp. 94-108, 2014. |
[63] | R. Pomfret, “The post-2007 financial crisis and policy challenges facing Australia,” Economic Papers, vol. 28, no. 3, pp. 255-263, 2009. |