[1] | B. Hassan, 2001, Study delay causes in construction executing projects, Syria, Tishreen University Magazine, VOL 61/S.M.J. |
[2] | J. Omran, F. Jrad, H. Zagbour, 2007, Develop methodology to avoid delay in Syrian construction projects, Syria, Tishreen University Magazine, No 3, VOL29. |
[3] | M. Jnaid, M. Nayfa, 2011, Delay in construction projects in Syria, Syria, Damascus University, Journal Vol. (27) - No. (1). |
[4] | R. Maya, 2008, "Project management assessment methodology and performance modeling to improve the quality of projects executing strategies in Syria", Syria, PhD dissertation, Tishreen University. |
[5] | R. Maya, B. Hassan, J. Omran, 2015, Identify performance improvement scopes and priorities in construction companies, case study for general company for construction and building, Syria Tishreen university Journal, VOL 37, No 6. |
[6] | Higher commission for scientific research, 2012, national policy report for science and innovation, Syria. |
[7] | M. Dabag, 2015, Quality improvement by reducing rework in construction companies, Tishreen University, Faculty of civil engineering, Construction engineering and management department, master thesis. |
[8] | S. Beatham, C. Anumba, T. Thorpe, I. Hedges, 2004, KPI'S: a critical appraisal of their use in construction Benchmarking, An international Journal, 11(1), 93-117. |
[9] | W. S .Atkins, "Strategies for the European construction sector", 1994, Office for Official Publications of The European Communities, Brussels. |
[10] | S. Nudurupati, T. Arshad, T. Turner, 2007, Performance measurement in the construction industry An action case investigating manufacturing methodologies, Computers in Industry, 58 667–676. |
[11] | S. Tennant, and D. Langford,, 2008, "The construction project balanced scorecard. In: Dainty", a (Ed) Procs 24th Annual ARCOM Conference, 1-3 September, Cardiff, UK, Association of Researchers in Construction Management, 361-370. |
[12] | R. Maya, L. Ahmad, 2014, "Define most suitable indicators to follow up and improve performance of construction projects in Syria", Tishreen University Journal for Research and Scientific Studies, Engineering Sciences Series Vol. (36) no. (2). |
[13] | J.R. Dixon, A.J. Nanni, T.E. Vollmann, 1990, "The New performance challenge: measuring operations for World Class Competition", Dow Jones-Irwin Homewood, IL. |
[14] | R.S. Kaplan, D.P. Norton, 1992, "The balanced scorecard measures that drive performance", Harvard Business Review. |
[15] | A. Neely, 1999, The performance measurement revolution: why now and what next? , International Journal of Operations and Production Management 19 (2), 205–228. |
[16] | A. Neely, J. Mills, M. Gregory, K. Platts, 1995, Performance measurement system design—a literature review and research agenda, International Journal of Operations and Production Management 15 (4) 80 –116. |
[17] | U. Bititci, S. Nudurupati, 2002, Using performance measurement to drive continuous improvement, Manufacturing Engineer 81 (5) 230–235. |
[18] | C.D. Ittner, D.F. Larcker, 1998, Are nonfinancial measures leading indicators of financial performance? An analysis of customer satisfaction, Journal of Accounting Research 36 (Suppl.) 1–35. |
[19] | NIST, 2014, "Baldridge Award Criteria". National Institute for Standards and Technology: www.quality.nist.gov, website accessed December 02. |
[20] | "Constructing Excellence", 2009, UK Construction Industry KPIs. Retrieved May 16, 2009, from Constructing Excellence Website: www.constructingexcellence.org. |
[21] | The KPI Working Group, 2000, "Report for the Minister of construction the department for environment", Transport and Regions London. |
[22] | Construction Industry Institute, 2012, "Benchmarking and Metrics", www.constructioninstitute.org/ Accessed 12th July, 2012. |
[23] | Bourne, M., Mills, J., Wilcox, M., Neely, A. and Platts, K., 2000, Designing, implementing and updating performance measurement systems International Journal of Operations & Production Management, 20(7), 754-71 |
[24] | Bassioni, H.A., Price, A.D.F. and Hassan, T.M., 2004, Performance measurement in construction. Journal of Management in Engineering, 20(2), 42-50. |
[25] | Egan, J., "Rethinking construction, London", 1998, URN 03/951. |
[26] | D. Waggoner, A. Neely, M. Kennerley, 1999, The forces that shape organizational performance measurement system: an interdisciplinary review, International Journal of Production Dynamics 60-61, 53-60. |
[27] | The Performance-Based Management Special Interest Group (PBM SIG), 2001, "The Performance-Based Management Handbook", U.S. Department of Energy (DOE). |
[28] | S. Beatham, A. Chimay, and Thorpe, T., 2004, KPIs: a critical appraisal of their use in construction, Benchmarking, 11(1), 93–117. |
[29] | S. Wongrassamee, J.E.L. Simmons, P. D. and Gardiner, 2003, Performance measurement tools: the Balanced Scorecard and the EFQM Excellence Model, Measuring Business Excellence, 7(1), 14–29. |
[30] | S. Tennant, and D. Langford, 2008, "The construction project balanced scorecard. In: Dainty", A (Ed) Procs 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK, Association of Researchers in Construction Management, 361-370. |
[31] | S.M. Beatham, C.J. Anumba, A. Thorpe, and M.A.P. Murray, 2002, "Utilizing the EFQM excellence model to drive business improvement", in Gancalves, Advances in Concurrent Engineering, 9th ISPE International Conference on Concurrent Engineering, Cranfield University, UK, A.A. Balkema Publishers, Rotterdam, pp. 413-22. |
[32] | H.S. Robinson, C.J. Anumba, P.M. Carrillo, and l-Ghassani, A.M., 2005, Business performance measurement practices in construction engineering organizations, Measuring Business Excellence, Vol. 9 No. 1, pp. 13-22. |
[33] | R.S. Kaplan and Norton, D.P., 1992, "the balanced scorecard: Measures that drive performance", Harvard Business Review, Jan / Feb., 71–79. |
[34] | T. Khuan Chan1 and P. Hiap, 2012, A Balanced sscorecard approach to measuring industry performance, Journal of Construction in Developing Countries, Supp. 1, 23–41. |
[35] | R.S. Kaplan, D.P. Norton, 2001, "The strategy-focused organization: how balanced scorecard companies thrive in the new business environment", Harvard business school press, Boston, MA. |
[36] | Niven, P.R., 2006. "Balanced scorecard step-by-step: Maximizing performance and maintaining results". 2nd edition. New Jersey: John Wiley and Sons. |
[37] | D. Rigby, Barbara, 2013, "Management tools & trends", http://www.bain.com/Images/BAIN_BRIEF_Management_Tools%26_Trends. |
[38] | H.S. Robinson, P.M. Carrillo, C.J. Anumba and A.M. Al-Ghassani, 2005, "Review and implementation of performance management models in construction engineering organizations", Department of Civil and Building Engineering, Loughborough University, Leicestershire, UK Construction Innovation; 5: 203–217. |
[39] | S. Cheung, Henry C.H. Suen, Kevin K.W. Cheung, 2004, PPMS: a Web-based construction Project Performance Monitoring System, Automation in Construction 13, 361– 376. |
[40] | V. Luu, T., S. Kim, Y., & T. A. Huynh, 2008. Improving project management performance of large contractors using benchmarking approach. International Journal of Project Management, 758–769. |
[41] | H.A. Bassioni, T.M. Hassan and A.D.F., 2008, Price Evaluation and analysis of criteria and sub-criteria of a construction excellence model, Engineering, Construction and Architectural Management Vol. 15 No. 1, pp. 21-41, Emerald. |
[42] | N. Kim, M. Park, H.-S. Lee & S. Roh, 2007, "Performance management method for construction companies", 24th international symposium on Automation & Robotics in construction (ISRAC), Construction Automation group. |
[43] | F.Y. Yeung; Albert P.C. Chan; Daniel W.M. Chan, M.; Y.H. Chiang; and Huan Yang, June 2013, Developing a Benchmarking Model for Construction Projects in Hong Kong, Journal of Construction Engineering and Management (JCEM), ASCE, Volume 139, Issue 6, Pages 705-716. |
[44] | S. Douh, T. Adjei-Kumi, E. Adinyira, B. Baiden, 2014, Criteria and Measurable Indicators for Assessing the Performance of Public Works Contract Award Process in Chad, International Journal of Construction Engineering and Management, 3(2): 57-64 DOI: 10.5923/j.ijcem.20140302.03. |
[45] | J. Kwame O. Kuragu, B. Kofi Baiden, E. Badu, 2016, Key Performance Indicators for Project Success in Ghanaian Contractors, International Journal of Construction Engineering and Management, 5(1): 1-10 DOI: 10.5923/j.ijcem.20160501.01. |
[46] | A. Neely, M. Bourne, M. Kennerley, 2000, Performance measurement system design: developing and testing a process-based approach, International Journal of operations & Production Management, Vol. 20 No. 10, pp. 1119-1145. |
[47] | L. Ahmad, 2014. Improve performance of construction projects using automated follow up for Key performance indicators, master thesis, Tishreen University, Syria. (2). |
[48] | P. Garengo, S. Nudurupati, U. Bititci, 2007, Understanding the relationship between PMS and MIS in SMEs: An Organizational life cycle perspective, Science direct, computers in industry 58677-686. |
[49] | G. Aouad, M. Ormerod, M.sun, M. Sarshar, p. Barrett, M. Alshawi, 2000, Visualization of construction information: A process view. International Journal of Computer-integrated design and construction, Vol2, no 4, 206-214. |