[1] | Adedapo, A.O. and Dolapa, A. (2014). “Organizational Structure of Architectural Firms and Their Performances.” Int. J. Proj. Manage., 3(1), 1-12. |
[2] | Alfaroby, R.S. (2010). “Model for the Effective Management of Joint Ventures: A Case Study,” Approach [Online]. Available from: http://organizationcultures.info/2010/04/03/ moel-for-the-effective-management-of-joint-ventures-a-case-study-approach. [Accessed 31 August 2010]. |
[3] | Bagdonavicius, V., Kruopis, J., and Nikulin, M.S. (2011). "Non-parametric tests for complete data", London, U.K.: ISTE & WILEY. |
[4] | Bing, L. and Tiong, R. L. (1999). “Risk Management Model for International Construction Joint Ventures,” J. Constr. Eng. Manage., 125 (5), 377-384. |
[5] | Bing, L. Tiong, R. L. Fan, W. W., and Chew, D. A. (1999). “Risk Management in International Construction Joint Ventures,” J. Constr. Eng. Manage., 125 (4), 277-284. |
[6] | Chatterjee, L. (2009). “The role of cultures of governments, firm and civil society in multinational joint ventures in construction,” Joint Ventures in construction, Kobayashi, K., Rashid, K. A., Onishi, M. and Hasan, S. F. (eds.) London: Thomas Telford. |
[7] | Chen, C. and Messner, J. I. (2009). “Entry Mode Taxonomy for International Construction Markets,” J. Manage. Eng., 25 (1), 3-11. |
[8] | Custer, R. L., Scarcella, J. A. and Stewart B. R. (1999). “The Modified Delphi Technique - A Rotational Modification,” J. Voc. Tech. Educ., 15 (2), 50-58. |
[9] | Gale, A. and Luo, J. (2004). “Factors affecting construction joint ventures in China.” Int. J. Proj. Manage., 22 (1), 33-42 |
[10] | Guion, L., Diehl, D., and McDonald, D. (2011). “Conducting an In-depth Interview, University of Florida. Retrieved from" http://edis.ifas.ufl.edu/fy393. |
[11] | Hallowell, M. R. and Gambatese, J. A. (2010). “Qualitative Research: Application of Delphi technique to CEM Research.” J. Constr. Eng. Manage., 136 (1), 99-107. |
[12] | Holaander, W. and Wolfe, D. A. (1999). Nonparametric Statistical Methods, 2nd ed., New Jersey, U.S.A: Wiley –Interscience. |
[13] | Hillson, D. (1999). “Developing Effective Risk Response.” Proc., the 30th Int. Proj. Manage. Inst, Seminars & Symposium, Philadelphia, Pennsylvania USA. |
[14] | Institution of Civil Engineers and the Faculty and Institute of Actuaries (ICE) (2005). Risk Analysis and Management for Projects, 2nd ed. London, U.K.: Thomas Telford. |
[15] | International Standards Office (2009). ISO 31000 Risk management - Principles and guidelines, Switzerland: ISO. |
[16] | Julian, C. (2005). “International Joint Venture Performance in South East Asia, 1st ed. U.K.: Edward Elgar. |
[17] | Kobayashi, K., Rashid, K.A., Ofori, G., and Ogunlana, S. (2009). “Introduction.” Joint Ventures in construction, Kobayashi, K., Rashid, K. A., Onishi, M. and Hasan, S. F. (eds.) London, U.K.: Thomas Telford. |
[18] | Kumaraswamy, M. M. (1997). “Appropriate Appraisal and Apportionment of Megaproject Risks,” J. Prof. Iss. Eng. Ed. Pr., 123 (2), 51-56. |
[19] | Lehmann, E. L., (2004). Elements of Large-Sample Theory, 1st ed., New York, U.S.A: Springer. |
[20] | Lehmann, E. L., (2008). Testing Statistical Hypotheses, 3rd ed., New York, U.S.A: Springer. |
[21] | Likhitruangsilp, V. and Ioannou, G. (2012). "Analysis of Risk-Response Measures for Tunneling Projects," Proc., Construction Research Congress 2012, West Lafayette, Indiana, USA. |
[22] | Likhitruangsilp, V. and Mekkriengkrai, S. (2007). “Civil Liability of Construction Joint Ventures under Thai Legal Systems,” Proc., the 3rd Int. Con. on Multi-National Joint Venture for Construction Works, Bangkok, Thailand. |
[23] | Marks, T. (2012). “20:20 Project Management: How to Deliver on Time, on Budget and on Spec.”: Croydon: Kogan Page. |
[24] | Mohamed, S. (2003). “Performance in International Construction Joint Ventures Modeling Perspective.” J. Constr. Eng. Manage., 129 (6), 619-626. |
[25] | Odimabo, O.O. and Oduoza, C.F. (2013). “Risk Assessment Framework for Building Construction Projects’ in Developing Countries” Int. J. Proj. Manage, 2(5): 143-154 |
[26] | Ozorhon, B. Arditi, D. Dikmen, I. and Birgonul, M. T. (2008a). “Effect of Partner Fit in International Construction Joint Ventures,” J. Manage. Eng., 24 (1), 12-20. |
[27] | Ozorhon, B. Arditi, D. Dikmen, I. and Birgonul, M. T. (2008b). “Implications of Culture in the performance of international Construction Joint Ventures,” J. Constr. Eng. Manage., 134 (5), 361-370. |
[28] | Ozorhon, B. Arditi, D. Dikmen, I. and Birgonul, M. T. (2010). “Performance of International Joint Ventures in Construction,” J. Manage. Eng., 26 (4), 209-222. |
[29] | Patel, M. B. and Morris, P. G. W. (2008). “Guide to the Project Management Body of Knowledge.” Centre for Research in the Management of Projects, UK. |
[30] | Ping Ho, S. Lin , Y. Chu, W. and Wu, H. (2009). “Model for Organization Governance Structure Choices in Construction Joint Ventures,” J. Constr. Eng. Manage., 135 (6), 518-530. |
[31] | Prasitsom, A., (2014). “A life Cycle Risk Management and Prediction System for Construction Joint Ventures,” Ph.D. Eng. thesis, Chulalongkorn University, Bangkok, Thailand. |
[32] | Prasitsom, A. and Likhitruangsilp V. (2008). “Administrative Structures of Construction Joint Ventures in Thailand” Proc. of the 4th International Conference on Multi-National Joint Venture for Construction Works, October 30-31, 2008, Tainan, Taiwan. |
[33] | Prasitsom, A., and Likhitruangsilp, V. (2012). “Design of Administrative Structures for Construction Joint Ventures.” Joint Ventures in Construction 2: Contract, governance, performance and risk, Kobayashi, K., Rashid, K. A., Onishi, M. and Hasan, S. F. (eds.) London: Thomas Telford. |
[34] | Roma, Y. T., and Ogunlana, S. O., (2009). “Culture and workplace behavior: a case study of joint venture construction projects in Thailand,” Joint Ventures in construction, Kobayashi, K., Rashid, K. A., Onishi, M. and Hasan, S. F. (eds.) London: Thomas Telford. |
[35] | Seneviratne, P. N. and Ranasinghe, M. (1997). “Transportation Infrastructure Financing Evaluation of Alternatives,” J. Infra. Sys., 3 (3), 111-118. |
[36] | Shen, L.Y. Wu, W. C. and Catherine, S. K. (2001). “Risk Assessment for Construction Joint Ventures in China,” J. Constr. Eng. Manage., 127 (1), 76-81. |
[37] | Turner, J.R., and Müller, R., (2004). “Communication and cooperation on projects between the project owner as principal and the project manager as agent,” Eur. Manag. J., 22 (3), 327 – 336. |
[38] | Wasserman, L. (2006). All of Nonparametric Statistics, 1st ed., New York, U.S.A: Springer. |
[39] | Wideman, R.M. (2004). “The Role of the Project Life Cycle (Life Span) in Project Management” Maxwideman, < http://www.maxwideman.com> (Sep. 12, 2012). |
[40] | Yan, A., and Gray, B. Bargaining Power. (1994). “Management Control and Performance in United States – China Joint Ventures: A Comparative Case Study,” A. Manag. J., 37 (6), 1478 -1517. |
[41] | Zhang, G. and Zou, P. X. W. (2007). “Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China.” J. Constr. Eng. Manage., 133 (10), 771-779. |
[42] | Zhao, X., Hwang, B., and Yu, G. S. (2013). “Identifying the critical risk in underground rail international construction joint ventures: Case study of Singapore,” Int. J. Proj. Manag., 31(1), 554-556. |