[1] | Hollmann, John K., 2007, The Monte Carlo Challenge: A better approach, AACE International Transactions. |
[2] | Rodrigues, Alexander, “Managing and modeling project risk dynamics: a system dynamics-based framework”, Proceedings of the 4th European PMI conference, London, 2001. |
[3] | Perminova, Olga., Gustafsson, Magnus., Wikstrom, Kim, 2009,. Defining Uncertainty in projects- a new perspective, Journal of Project Management, 26, 73-78. |
[4] | Ali, Rashed, 2005, The Application of risk management in infrastructural construction projects, Journal of Cost Engineering Vo. 47/No. 8 pp 20-27. |
[5] | Patrascu Anghel, Construction cost engineering hand book, Mercel Dekker Inc, New York, 1998, |
[6] | Arditi, D, and Gunhan, S., 2007, Avoiding change orders in public school construction. J. Profl. Issues Eng. Educ.Pract., 133(1), 67-73. |
[7] | Touran, A., 2003, “Calculating Contingency in Construction Projects”, Journal of Engineering, management, IEE Transaction. |
[8] | Thompson, P.A. & Perry J.G., 1992., Engineering Construction Risk: a guide to project risk analysis and risk management, Thompson Telford, London. |
[9] | Hartman, F. T, Chen, D, 2000, A neural network approach to risk assessment and contingency allocation. ACCE Transactions, Risk. 07.01-6. |
[10] | Lee, E., Park, Y. & Shin, J., 2009, Large engineering project risk management using a Bayesian belief network, Expert Systems with Applications. An International Journal, v.36 n.3, 5880-5887, April. |
[11] | Niklov Andrily, Victoria Uren, Nrico Motta and Anne de Roeck, 2008, Using the Dempster-Shafer Theory of Evidence to Resolve a Box Inconsistencies, working paper, Knowledge media Institute, The Open University, Milton Keynes, UK. |
[12] | Keith, R Molenaar, 2011, A risk based approach to contingency estimating in highway project development, American Society of Civil Engineers, pp 786-795. |
[13] | Keith, R Molenaar, 2007, Programmatic cost risk analysis for highway megaprojects. J. Constr. Manage,131, 343,. |
[14] | Hollmann, John K. (2009), Recommended practices for risk analysis and cost contingency estimating, AACE International Transactions. |
[15] | Kumar, R., Research methodology: A step by step guide for beginners, London, SAGE Publications, 1999. |
[16] | Clark, G.M. and Cook, D., A basic course in statistics. 4th Ed, New York, Arnold, 1998. |
[17] | Buertey, J. T.I, Abeere-Inga, E.; Adjei Kumi, T. “Successful Delivery of Infrastructural Projects: Epistemic Overview of Cost Risk and Uncertainties” In Proceedings of 1st International Conference on Infrastructure Development in Africa at KNUST, Kumasi, 22nd – 24th March 2012. |
[18] | Buertey, J. T.I, Abeere-Inga, E.; Adjei Kumi, T. “ Estimating Cost Contingency for Construction Projects, the impact of systemic and Project specific risk” In Proceedings of the WABER 2012, Abujah, Nigeria, 22-24th July 2012. |
[19] | Buertey, J. T.I, Abeere-Inga, E.; Adjei Kumi, T. “Practical Application of Risk Management Techniques In Infrastructural Delivery” In Proceedings of 1st International Conference on Infrastructure Development in Africa at KNUST, Kumasi, 22nd – 24th March 2012. |